Snow Removal
During a snow event, the City is divided into four quadrants with the City's four snowplows working simultaneously. Street and Park Division personnel work 12-hour shifts, 7 days a week until the streets are passable. Streets are prioritized with major arteries, hills and curves being the first to be treated and cleared.
|
The Street Department will be working in the following priority order:
|
|
Major Streets (West of Main)
|
| Kingshighway |
Wakefield |
Jaycee |
| New Madrid |
Helen |
Downtown Area |
| Murray Lane |
Tanner |
RR Crossings |
| South West |
West North |
Schools |
| North West |
Rose Parkway |
School Street |
| Henning |
|
|
| |
|
Major Streets (East of Main)
|
| Salcedo (Main to Ingram) |
Industrial Drive |
Selma |
| Helen |
Marion |
Kennedy |
| S. Ingram |
County Line |
Smith |
| N. Ingram |
Glenn |
Linn |
| Ables Road |
Mitchell |
RR Crossings |
| Broadway |
Garwood |
Schools |
| Illinois |
Pine |
George E. Day |
| Plaza |
|
|
| |
|
Hills
|
| Murray Lane |
Compress |
Delores |
| Butler |
Wakefield |
Troy |
| William |
Helen |
Smith |
| North Street |
Ables Road |
N. Ingram |
| Ford |
Virginia |
Salcedo at Ingram |
| |
|
Curves
|
| S. Kingshighway |
Cambridge |
N. Kinshighway |
| North Ingram |
Salcedo |
|
| |
|
|
|
Secondary Streets (West of Main)
|
| Larcel |
Compress |
Calvary |
| Gladys |
Sunset |
Salcedo (Main to Kingshighway) |
| Allen |
Butler |
Davis |
| William (Branum to Jaycee) |
Carroll |
Kiwanis |
| Euclid |
Vaughn |
Clayton |
| Stalcup |
Branum |
Greenbriar |
| |
|
|
|
Secondary Streets of Main
|
| Plantation |
Airport Drive |
Dudley |
| Ashley |
Sikes |
Missouri |
| Gladys |
Lillian |
Pine |
| Columbine |
Cambridge |
Kathleen to Missouri |
| |
|
|
|
Residential Sections
|
| One Plow in Section A (West of Main, North of Malone) |
| One Plow in Section B (East of Main, North of Malone) |
| One Plow in Section C (West of Main, South of Malone) |
| One Plow in Section D (East of Main, South of Malone) |
|